At All Souls – the rear wall is sealed by me before being painted over by volunteers from the parish.
In the workshop – the Swell division’s windchest and soundboard are rebuilt and the pipes are refurbished and fitted with new tuning slides (metal sleeves which are moved up and down the top of a pipe to tune it). The windchests for the pedal bass pipes are being remade completely (they could not be refurbished – they were originally so poorly made that they leaked wind very badly).

Looking into a rebuilt pedal windchest showing the small bellows motors which control the wind supply to each big pipe
